top of page

Marine Projects

2012

River Walk Connector

Owner: City of Milwaukee   DPW#77

Prime: Gillen Company

Carpentry Gluelam Beams & Iron Wood Deck

 

2006

Floating Dockage System BP #18A: Milwaukee, WI

Owner:  Pier Wisconsin LTD

Prime:  Gilbane Building Co.

Architect:  Hammel, Green & Abrahamson Inc.

Installation of heavy duty floating dockage and ADA gangway.  Ramps for the Pier Wisconsin project.  The docks have special architectural attractions.

 

US Coast Guard – Boat Garage: Bayfield, WI

Owner:  US Coast Guard

Prime:  Platt Construction, Inc.

Architect:  Lebend Architecture, LLC

Design build services for 3,320 sf. boat garage.  Pre-engineered steel building is constructed on end of pier in remote site on shore of Lake Superior. 52’ x 45’ building has internal office, wet rooms and work areas and mezzanine building sits on 75 ft. deep piles and structural slab supports 350 p.s.f.load.

 

 

2005

Discovery World-Pier Wisconsin: Milwaukee, WI

Owner:  Pier Wisconsin LTD

Prime:  Gilbane Building

Architect: Hammel Green & Abrahamson

Site concrete work, sidewalks, roads asphalt paving. Site Carpentry work – construction of Amphitheater over water, hardwood decking, piers, boardwalks, special overhead doors (High speed)

bottom of page