Power Projects

Current

Diesel Storage Project Pleasant Prairie # 14721 (AZCO)

Owner: WE Energies

Architect:

Excavation Concrete Slab

 

2012

Replace Electrical Switchgear Bldg 407 Task #01

Owner: Depart of Veterans Affairs #VA69D-12-D-0181/676-C20195

Prime: Platt Construction, Inc.

Replace Electrical Switchgears

 

2011

Replace B-446 Generator and Install Switchgear Bldg. 401: Tomah, WI

Owner: Departmnet of Veterans Affairs

Prime: Platt Construction, Inc.

Furnish all labor, materials, equipment

 

2010

Segregate Emergency Power B404: Tomah, WI

Owner:  Dept. of Veterans Affairs   #VA69DC-RA-1325

Prime: Platt Construction, Inc.

Project consists of installation of new electrical panels, conduit and wiring in the electrical vault and on the patient care floors.  Complete in place and ready for operation which will provide segregation of the emergency power into three branches to comply with the National Electrical Code.

 

Segregate Emergancy Power B406: Milwaukee, WI

Owner: Department of Veterans # VA69DC-RA-1326

Prime: Platt Construction, Inc.

 

2008

Replace Secondary Electric Panels

Owner: Dept. of Veteran Affairs

Prime: VA Medical

Replacing of electrical panels

 

Replace Switchgear & Install Generator: Tomah, WI

Bldg. 403

Owner: Dept. of Veterans Affairs

Prime: Platt Construction, Inc.

Demolition and removal of old caterpillar generator, installation of a new Cummins generator in building 445. 

Building 451- installation of a new Cummins generator, replacement of existing switchgear. Also, replaced switchgear and install generator in B403.

 

Replace Switchgear & Install Generator: Tomah, WI

Bldg. 400

Owner:  Dept. of Veterans Affairs

Prime:  Platt Construction, Inc.

Installation of a new Cummings generator in building 447A, replacement of existing switchgear and same for building 400.

 

2004

General Mitchell International Airport – Contract # 1

Owner:

Prime: Pieper Electric

Duct Bank Expansion

 

Pleasant Prairie Power Plant: Pleasant Prairie, WI

Owner:  We Energies

Prime Contractor:  Washington Group, Int’l

Architect:  Bloom Consultants

Design/build package for 40,000 s.f. warehouse/maintenance building with pre-engineered metal roof/column system, masonry exterior, site work, toilet room.

 

Port Washington Power Plant

Owner:

Prime: Wisconsin Power Contractors # 25676-0003-032SC

 

Zabrdker Building City of Milw  #C545040071

Owner: City of Milwaukee

Prime: Pieper Electric #BU11091217

Switch Gear Installation

 

2003

Ash Storage Facility Oak Creek Power Plant

Owner:

Prime: We Energies

 

River side Pump Station # R -152

Owner:

Prime: Pieper Electric

Switchgear Replacement